Final Acceptance Certificate for Mission FED/2017/385-738 (Construction of Basic Infrastructure in Abia State) – Lot 1

Body

Programme      Construction of Basic Rural Infrastructures  in the 9 Niger Delta States – NDSP4 

Contract           FED/2017/385-738 (Construction of Basic Infrastructure in Abia State) lot 1

Contractor       Edon Nigeria Limited; No. 1 Edward Nkwegu Close, Abakaliki, Ebonyi State

 

 

S/n

Project

Community

Project

LGA/State

Date of Provisional

Date of Final

 

 

SN-ID

 

 

 

Acceptance

Acceptance

 

 

 

 

 

 

 

 

 

Abia

State

 

 

 

 

 

 

1

5

Azunchai

Palm oil mill

Ikwuano/Abia

04/07/2019

11/08/2020

 

2

1

Ekpiri Ariam

Palm oil mill

Ikwuano/Abia

04/07/2019

11/08/2020

 

3

11

Ndinwankwo

Cassava mill

Ikwuano/Abia

04/07/2019

11/08/2020

 

4

6

Umuizuaku

Civic centre

Umuahia North/Abia

06/07/2019

12/08/2020

 

5

4

Umuokorodo

Palm oil mill

Umuahia South/Abia

03/07/2019

12/08/2020

 

6

6

Eziama Ubakala

Civic centre

Umuahia South/Abia

05/07/2019

12/08/2020

 

7

1

Umuovinola

Solar water

Umuahia South/Abia

03/07/2019

13/08/2020

 

8

5

Umuobutu Old

Civic centre

Umuahia South/Abia

05/07/2019

13/08/2020

 

 

 

 

 

 

 

 

 

Cross River State

 

 

 

 

 

9

6

Obong Obung

Water

Obudu/CRS

12/07/2019

17/08/2020

 

10

9

Ibi Bebuagbong

Water

Obudu/CRS

12/07/2019

17/08/2020

 

11

15

Abaribara

Water

Biase/CRS

10/07/2019

18/08/2020

 

12

15

Usumutong

Water

Abi/CRS

09/07/2019

18/08/2020

 

13

13

Bazohure West

Water

Abi/CRS

09/07/2019

18/08/2020

 

14

12

Igonigoni South

Water

Abi/CRS

10/07/2019

19/08/2020

 

15

16

Abanwa

Open market

Biase/CRS

11/07/2019

19/08/2020

 

16

17

Ipah-Akono

Open market

Biase/CRS

11/07/2019

19/08/2020

 

 

 

 

 

 

 

 

 

 

Total

16 Projects